<pre>
Written in org-mode
* Projects
* Projects
** Electrical
** Electrical
*** In
</pre>
**** run code electrical to light in kitchen
 
**** Run electrical to Form1 room
 
**** Run electrical to kiln
[[Media:Workshop_Plan_Proposal.pdf|Floorplan submitted by Slade]]
**** hole in outlet above projector
 
**** inspect for exposed outlets
 
**** install lights in hallway
Some deliverables absolutely require a licensed electrician.  Given that, we aim to identify all deliverables that do require an electrician, as well as other deliverables that can better be addressed by an electrician, assuming that we engage one for a deliverable requiring a permit.
*** Considering
 
**** 120v cables to quads in workshop
Installing power for the kiln (many Freesiders await the ability to use our fine kiln) requires 240V power, and hence a permit, and hence a licensed electrician. A number of other desired improvements would benefit from the installation of 240V power in convenient places.
**** 240v to front left corner of auto bay
Installing power more conveniently located in the non-metal area of the workshop would require 120V power, and woul require a permit, and hence an electrician.
**** 240v to large air compressor
 
**** 240v to welding table
Some deliverables might not require a permit or licensed electrician, such as connecting wired outlets to existing power in junction boxes.
 
We need to finalize our agenda for use when conferring with an electrician. Jud has contacted two.  One has responded. However, these quotes will not address the agenda we will soon create, so these quotes will be used as references.
<pre>
 
*** In Scope
 
**** Need an electrician
***** 220V
****** Power requirements
- 50A to welding table (drop from ceiling, plug to match current MIG welder)
- 50A to kiln (plug to match kiln) Can run along the back side of the wall above the door openings, or ceiling
- At least 30A to air compressor (plug to match compressor) Can run along the back side of the wall above the door openings, or ceiling
 
***** 120V
- lights outside in the back need to be wired in. The two outer ones are new installs, the center one is old and may not work.
- add a switched circuit for lighting over the machine shop and auto bay. Switch should be located near the west door, switched junction boxes on the ceiling near the back of the bays (this will allow someone coming in from the back of the space to turn lights on once we have access control) Freeside can install appropriate lighting fixtures here once the wiring is there to support it.
- add more 120 to the East wall and South wall of the shop (where the miter saw is) from one of the main junction boxes for additional power tool usage. 1 4 gang plug centrally located on the South wall, one 2 gang plug on the East wall every X (10?) feet all the way to the back of the space*, including the auto bay. From this Freeside will take care of running the floor channels as needed based upon the shop layout. *If it is easier to run 120 to the East wall in the auto bay from the West wall while running the for the compressor and kiln, that works too.
 
 
*** Out of scope/Freeside can handle
 
**** Might not need an electrician
****** light in kitchen
Do not want to use outlet just above light because that is not switched
****** Connect power to Form1 room
Existing work
****** Connect power to Art wall
Existing work
****** lights in hallway
Existing work
 
**** Do not need an electrician
Inspect every wall and ceiling for outlet boxes or junction boxes that need faces or prot holes covered


| Attraction | count | Usable | Further Improvements | Notes |
*** Considering to Move Into Scope
| | | | | |
**** [Empty]
|-------------------------+-------+------------+--------------------------------------------------+--------------------------------------------------------------------------------------------|
</pre>
| Laser Cutter | 1 | 0 | replace tube, ventilation, electrical | ventilation works but should be fixed in place. Electrical works, but only from one socket |
 
| SLA printer | 1 | 1 | ventilation, electrical | ventilation works but should be fixed in place. Electrical works, but only from one socket |
:::* Electricians Contacted:
| Kiln | 1 | 0 | electrical | Need electrician to hook up. Scott says we need ventilation. Laura says we do not. |
::::* Greg Pica of Socket Doctors
| Vacuum Table | 1 | 1 | electrical | Needs electrical improvements. Nathan wants Scott's review |
 
| Autobay | 1 | 0 | Move non-autobay stuff out | Pallet, biolab items, shelving WIP |
:::::* [[Media:socket_doctor.jpg|business card]]
| Front Room as Classroom | 1 | 0 | move biolab stuff out, clear tables, abate sound | |
 
| Lulzbot Mini | 1 | 1 | | |
:::::* No document (quote or estimate) received yet. (27 September)
| Kraken | 1 | 0 | | |
 
| Large CNC | 1 | 1 | | |
::::* Twon of AG Electrical LLC
| | | | | |
 
|-------------------------+-------+------------+--------------------------------------------------+--------------------------------------------------------------------------------------------|
:::::* Phone: +1-470-301-7696
| | 9 | 4 | | |
 
| | | 0.44444444 | | |
:::::* [[Media:Screenshot_20160928-151459.png|Estimate Document]]
| | | | | |
 
#+TBLFM: $3=(@13$3)/(@13$2)::@13$2=vsum(@3..11)::@13$3=vsum(@3..11)
* [[Media:20160929_135417.jpg|Sub-panel B]]
* Marquee Attractions Usability
 
** Scorecard
* [[Media:20160929_135426.jpg|Contents - Sub-panel B]]
- [3/11] Scorecard
 
- [-] SLA
[[One-if-by-land-three-if-by-air|Alternatives for last mile]]
- [ ] Kiln
- [X] Laser Cutter
- [X] Lulzbot Mini (codename: Rosebud)
- [ ] Kraken
- [ ] Paint Booth
- [ ] Vacuum table
- [-] Autobay
- [ ] Bio lab
- [ ] Front Room as Classroom
- [X] Large CNC
- [3/11] Detail
- [-] SLA
- [X] complete ventilation
- [ ] complete electrical
- [ ] Kiln
- [ ] complete electrical
- [X] Laser Cutter
- [X] Lulzbot Mini
- [ ] Kraken
- [ ] fix alignment
- [ ] Paint Booth
- [ ] complete ventilation
- [ ] Vacuum table
- [ ] complete electrical
- [-] Autobay
- [ ] remove Chaos Corps pallet
- [ ] remove biolab stuff
- [X] remove completed shelving parts
- [ ] Bio lab
- [ ] remove excess
- [ ] build table stand for vacuum hood
- [ ] Front Room as Classroom
- [ ] abate sound
- [X] Large CNC
** Tasks
- [6/7] Make SLA useable
- [ ] Electricity - separate section
- [X] Ventilation - separate section
- [X] Install Ethernet in SLA Room
- [X] decide where it is to connect at far end
- [X] measure length of CAT-5 required
- [X] cut CAT-5 to length - Jud
- [X] drop CAT-5 cable as required - Jud
- [X] connect CAT-5 at end far from SLA room - Cory
- [X] install wall jacks in SLA room
- [X] decide what to buy - Jud -
- [X] buy - Jud
- [X] emplace dust barrier
- [X] Emplace SLA
- [X] find power supply
- [3/4] Make Kiln Usable
- [X] usable
- [X] Plan final location of equipment
- [ ] modify electrical to suit - separate section
- [X] move existing items out of the way
- [3/3] Make Laser Cutter Usable in SLA room
- [X] replace tube
- [X] ventilation - separate section
- [X] emplace
- [0/1] Make Vacuum Table Usable
- [-] Electrical
- [X] Find email from Scott that explains everything
- [X] document conversation with John the Elder from Home Depot
- [X] Parts
- [X] stuff gotten by Scott
- [X] enclosure
- [X] Assemble relayed power control box
- [ ] final changes before scott gets back - Nathan
- [0/0] Make Autobay Usable - Target is to be cleared of biolab stuff by 26 July
- [3/8] remove stuff that is in the way
- [1/2] shelving
- [X] shelf frames
- [ ] material for additional shelves
- [0/0] Detritus from Biotech Inheritance
- [2/6] Put Inventory on Craigslist - Nathan
- [ ] Carts
- [ ] Computers
- [ ] adapters
- [ ] oven
- [X] bath
- [X] liquid robot
- [0/6] Put Inventory on ebay - Nathan
- [ ] Carts
- [ ] Computers
- [ ] adapters
- [ ] oven
- [ ] bath
- [ ] liquid robot
- [0/6] Sell Item - Nathan
- [ ] Carts
- [ ] Computers
- [ ] adapters
- [ ] oven
- [ ] bath
- [ ] liquid robot
- [X] Put Photos on Google Drive - Rowan
- [X] Set up Craigslist account - Nathan
- [ ] Decide how long to wait - Nathan
- [ ] Wait
- [ ] pallet - Randy
- [X] Kali's metal bandsaw - Kali
- [X] Put in Recyclium with note that it is Kali's
- [X] (OR) Remove
- [ ] Two catchments of used oil - Fess Up!
- [ ] Cosplay pole stands - Cosplay
- [0/0] Make Front Room usable as classroom
- [1/4] Other Improvements
- [X] Kali's Saw
- [ ] fix front display
- [ ] fix gate code mailer
- [ ] remove cosplay stuff from front room
- [ ] emplace baby head
- [ ] more shelving for kitchen
- [ ] fix rack on drill press
| Item | Qty | photos to Nathan | listed eb | listed cr | sold |
|-----------------+-----+------------------+-----------+-----------+------|
| Computer Cart | 2 | y | | y | |
| Computer | ? | y | | y | |
| HP adapter | 3+ | y | | | |
| Liquid Robot | 1 | y | | y | |
| bath | 1 | y | | y | |
| Analytical Oven | 1 | 1 | | | |
* Other
** Metal-cutting band saw
Nathan and I fixed it. the band had come off the rollers.
I fixed it again. cleaned rollers, carefully placed blade, tightened rollers
** Drill Press
The drill press keeps having the rack slip out of being held to the post. We will try attaching the rack to the post with epoxy. If that does not work, we will try tack welding the rack to the post at the verey top and bottom.
I used JB weld to fasten the rtack to the post. The JB eeld is cracking, currently not slipping.
- [ ] Order part
** Lighting in Hall
- [ ] Electical (separate below)
* third set of Member Storage Shelves
- [5/5] Make Shelf frames - Jonathan
- [X] finish shelf frame 1
- [X] finish shelf frame 2
- [X] finish shelf frame 3
- [X] cut cross-members to fit
- [X] weld together shelf frame
- [X] clean welds
- [X] finish shelf frame 4
- [X] cut cross-members to fit
- [X] weld together shelf frame
- [X] clean welds
- [X] finish shelf frame 5
- [X] cut cross-members to fit
- [X] weld together shelf frame
- [X] clean welds
- [ ] Make Shelf Uprights
- [ ] Weld shelf unit
- [ ] install plywood
- [ ] calculate requirements
- [ ] buy wood
- [ ] cut wood
- [ ] glue wood to shelf framesud
** Clean Ham Shack
- [ ] remove sewing crap
- [ ] Review stuff for usefulness to Freeside
- [X] Remove cabinets
- [X] Remove non-HAM stuff
- [ ] remove white desk
- [ ] Filter stuff that might be HAM stuff - Randy
** [4/10] Connect Electricity
Target date to CALL electician to come and visit - 15 days (11 Jun)
- [ ] Find judge that sentenced Robert to community service
- [ ] have him send others (electrician, carpenter) our way
- [X] Identify potential electricians
- [X] Contact potential electricians
- [X] have potential electricians visit
- [X] explain requirements to electricians
- [ ] receive quote or estimate from electician
- [ ] decide whether to involve Metropolitan
- [ ] order work
- [ ] have work done
*** Requirements
**** Lighting in Hallway
**** Drops in workshop
**** SLA room
- [ ] connect at junction box above kitchen wall
- [ ] connect at junction box above admin closet wall
**** Vac Forming Table
- [X] document wiring
Unknown state - works, but Nathan wants to get something in particular done before Scott returns
- [X] device to plug
- [X] outlet to main (via GFCI)
- [X] document parts
- [X] connectors?
- [X] enclosure
- [X] clamps for wire through openings in enclosure
- [X] GFCI devices
- [X] order parts
- [X] receive parts
- [X] do work we are authorized to do
- [ ] finish mystery work - Nathan
**** Kiln
- [ ] document wiring
- [ ] within kiln, to plug
- [ ] from plug to mains
Red, Black, White, Green
- [ ] document parts
- [ ] connectors?
- [ ] enclosure?
- [ ] clamps for wire through openings in enclosure?
- [ ] GFCI devices?
- [ ] order parts
- [ ] receive parts
- [ ] do work we are authorized to do
**** repair kitchen light wiring
** [4/6] Ventilation - Nathan
- [X] Design - Dryer vent pipe is 4"
- [X] Buy materials - Jud
- [X] 4" elbows 2
- [ ] straps
- [ ] nails or whatever
- [X] Purple PVC Glue
- [X] attach PCV to metal pipe from ceiling using flared end of PVC on hand
- [X] attach 4" elbows
- [ ] attach straps to hold pipes onto wall
* Notes
** Wifi Improvement
< $300
** Better Projector
< $600 (per Cory)
** Cameras
- [ ] Identify existing cameras
- [ ] Identify requirements for cameras out back
** Front Area Slide Show
- [X] power
- [ ] ethernet - Cory
- [X] order SD card
- [X] SD card - Nathan
- [ ] document restart procedures
** [1/3] Front (Class) Room
*** Priorities:
- Noise Abatement - be able to have classes or events in the classroom, and in the auditorium area
- Expense - Lower is better
- [ ] Mark Height - Jud and Cory
- [X] Calculate area of room
- [ ] Quotes (Cameraon and Wolf)
- [ ] Get quotes for dropped ceiling
- [ ] get quotes for ceiling with joists
- [ ] get quotes for extended walls
Dimensions
24' 4" long
14' 7" wide
~196" to ceiling
drywall wall about 10' high (varies)
Sprinkler head brass rings are 10' from floor
- [ ] Double check tools, accessories
**** Any extra material required to hold the ceiling up?
**** How to work around ventilation
- [ ] Cost materials
**** HD
100 sq ft grid (need 4) -- $143 @ = 572
32 sq foot tile (need 12) -- $63.04 @ = 756.48
**** Lowes
** Electrical
Used http://www.homeadvisor.com/
Angel Electric, LLC
arocasio@angelelectricllc.com
678-799-5437
* Fix outlets near worcal to light in kitchen tables
- [ ] get two extension cords
- [ ] get continuity tester
- [ ] test all combinations
- [ ] make diagram showing connectivity
- [ ] see if wiring is available from admin storage closet
- [ ] see if wiring is available from ceiling
* Set up PC for use as specialized Laser Cutter (or CNC mill) PC
** Status
*** Tasks
- [X] identify PC to use
- [X] box
- [X] keyboard
- [X] mouse
- [X] monitors
- [X] install Win XP 32 bit OS
- [X] get ISO
-- install OS
- [X] USB install - OB
OR
- [X] CD install
- [X] burn new ISO - failed
- [X] get blank CD - thanks, Scott
- [X] burn ISO to CD
- [X] install OS using CD - tried, failed
OR
- [X] use existing install CD
- [X] get existing install CD - Slade
- [X] install using CD)
- [X] install physical parallel port - On the computer provided by Slade
This might not be required; if we use the Dell Precision 490 brought by Slade, it has a parallel port.
- [-] install CamBam
- [X] Download Software
- [X] install software - Stuck here - need internet access to get DotNet 2.0. Ethernet port does not have driver.
- [ ] install license
- [X] copy files to Desktop of new computer
- [-] install Mach3
- [X] Download Software
- [X] install software
- [ ] configuring Mach3 with the right stepper profiles
- [ ] identify steps to configuring Mach3 with the right stepper profiles -- Randy
- [ ] install license
- [ ] emplace PC
- [ ] modify rolling cart to accept new computer - Jonathan contacted
- [ ] test monitor on rolling stand to see if it works with computer provided by Slade
** Next
- [ ] Emplace License
- [ ] identify steps to configuring Mach3 with the right stepper profiles -- Randy
General instructions provided by Scott.
*** Other?
- [-] Fix Drill Press
- [X] Call and order rack - info has been emailed to Nathan
- [ ] receive part
- [ ] install

Latest revision as of 18:30, 30 September 2016

This page is for discussion about a planned cycle of improvements to Freeside.

A Punch List of tasks to be accomplished is here.

Written in org-mode
* Projects
** Electrical


Floorplan submitted by Slade


Some deliverables absolutely require a licensed electrician. Given that, we aim to identify all deliverables that do require an electrician, as well as other deliverables that can better be addressed by an electrician, assuming that we engage one for a deliverable requiring a permit.

Installing power for the kiln (many Freesiders await the ability to use our fine kiln) requires 240V power, and hence a permit, and hence a licensed electrician. A number of other desired improvements would benefit from the installation of 240V power in convenient places. Installing power more conveniently located in the non-metal area of the workshop would require 120V power, and woul require a permit, and hence an electrician.

Some deliverables might not require a permit or licensed electrician, such as connecting wired outlets to existing power in junction boxes.

We need to finalize our agenda for use when conferring with an electrician. Jud has contacted two. One has responded. However, these quotes will not address the agenda we will soon create, so these quotes will be used as references.


*** In Scope

**** Need an electrician
***** 220V
****** Power requirements 
- 50A to welding table (drop from ceiling, plug to match current MIG welder)
- 50A to kiln (plug to match kiln) Can run along the back side of the wall above the door openings, or ceiling
- At least 30A to air compressor (plug to match compressor) Can run along the back side of the wall above the door openings, or ceiling

***** 120V
- lights outside in the back need to be wired in. The two outer ones are new installs, the center one is old and may not work. 
- add a switched circuit for lighting over the machine shop and auto bay. Switch should be located near the west door, switched junction boxes on the ceiling near the back of the bays (this will allow someone coming in from the back of the space to turn lights on once we have access control) Freeside can install appropriate lighting fixtures here once the wiring is there to support it. 
- add more 120 to the East wall and South wall of the shop (where the miter saw is) from one of the main junction boxes for additional power tool usage. 1 4 gang plug centrally located on the South wall, one 2 gang plug on the East wall every X (10?) feet all the way to the back of the space*, including the auto bay. From this Freeside will take care of running the floor channels as needed based upon the shop layout. *If it is easier to run 120 to the East wall in the auto bay from the West wall while running the for the compressor and kiln, that works too. 


*** Out of scope/Freeside can handle

**** Might not need an electrician
****** light in kitchen
Do not want to use outlet just above light because that is not switched
****** Connect power to Form1 room
Existing work
****** Connect power to Art wall
Existing work
****** lights in hallway
Existing work

**** Do not need an electrician
Inspect every wall and ceiling for outlet boxes or junction boxes that need faces or prot holes covered

*** Considering to Move Into Scope
**** [Empty]
  • Electricians Contacted:
  • Greg Pica of Socket Doctors
  • No document (quote or estimate) received yet. (27 September)
  • Twon of AG Electrical LLC
  • Phone: +1-470-301-7696

Alternatives for last mile