Difference between revisions of "Buildout"
Line 1: | Line 1: | ||
Potential Projects | Potential Projects | ||
- Paint outdoor front black | - [ ] Kill anthills in entrance and outside air cooler (and look for others) | ||
- Touch up the west wall with white | |||
- Paint a big freeside logo on west wall | - [ ] Paint outdoor front black | ||
- Finish the green room | |||
- Member storage shelves | - [ ] Touch up the west wall with white | ||
- General cleaning | |||
- Fix hole in hallway | - [ ] Paint a big freeside logo on west wall | ||
- Wall screens | |||
- [ ] Finish the green room | |||
- [ ] Member storage shelves | |||
- [ ] General cleaning | |||
- [ ] Fix hole in hallway | |||
- [ ] Wall screens | |||
- [ ] weather-stripping front door | - [ ] weather-stripping front door |
Revision as of 19:59, 7 April 2017
Potential Projects
- [ ] Kill anthills in entrance and outside air cooler (and look for others)
- [ ] Paint outdoor front black
- [ ] Touch up the west wall with white
- [ ] Paint a big freeside logo on west wall
- [ ] Finish the green room
- [ ] Member storage shelves
- [ ] General cleaning
- [ ] Fix hole in hallway
- [ ] Wall screens
- [ ] weather-stripping front door
- [ ] dishwasher
- [ ] remove whistling thing from air ducting
- [ ] new couch(es)
- [ ] cover electrical in scary bathroom
- [ ] new foundry
- [ ] light at front door (bulb out)
- [ ] install broom handle holders for lamp stands in green room
- [ ] replace or repair fluorescent light near member storage
- [ ] replace or repair fluorescent lights in tool room
- [ ] replace or repair fluorescent lights in workshop
- [ ] get computer donated by Slade working, with apps
- [ ] add shelves to new shelves frame