Difference between revisions of "Buildout"

From Freeside Atlanta
Jump to navigation Jump to search
Line 1: Line 1:
Potential Projects
Potential Projects


- Paint outdoor front black   
- [ ] Kill anthills in entrance and outside air cooler (and look for others)
- Touch up the west wall with white   
 
- Paint a big freeside logo on west wall   
- [ ] Paint outdoor front black   
- Finish the green room   
 
- Member storage shelves   
- [ ] Touch up the west wall with white   
- General cleaning   
 
- Fix hole in hallway   
- [ ] Paint a big freeside logo on west wall   
- Wall screens   
 
- [ ] Finish the green room   
 
- [ ] Member storage shelves   
 
- [ ] General cleaning   
 
- [ ] Fix hole in hallway   
 
- [ ] Wall screens   


- [ ] weather-stripping front door
- [ ] weather-stripping front door

Revision as of 19:59, 7 April 2017

Potential Projects

- [ ] Kill anthills in entrance and outside air cooler (and look for others)

- [ ] Paint outdoor front black

- [ ] Touch up the west wall with white

- [ ] Paint a big freeside logo on west wall

- [ ] Finish the green room

- [ ] Member storage shelves

- [ ] General cleaning

- [ ] Fix hole in hallway

- [ ] Wall screens

- [ ] weather-stripping front door

- [ ] dishwasher

- [ ] remove whistling thing from air ducting

- [ ] new couch(es)

- [ ] cover electrical in scary bathroom

- [ ] new foundry

- [ ] light at front door (bulb out)

- [ ] install broom handle holders for lamp stands in green room

- [ ] replace or repair fluorescent light near member storage

- [ ] replace or repair fluorescent lights in tool room

- [ ] replace or repair fluorescent lights in workshop

- [ ] get computer donated by Slade working, with apps

- [ ] add shelves to new shelves frame