Difference between revisions of "Improve Electrics"
Jump to navigation
Jump to search
(Replaced content with " * Projects ** Electrical Punch List *** In **** run code electrical to light in kitchen **** Run electrical to Form1 room **** Run electrical to kiln Per Scott, needs **...") |
|||
Line 3: | Line 3: | ||
** Electrical | ** Electrical | ||
Punch List | Punch List | ||
*** In | *** In | ||
**** run code electrical to light in kitchen | **** run code electrical to light in kitchen |
Revision as of 20:40, 15 September 2016
- Projects
- Electrical
Punch List
- In
- run code electrical to light in kitchen
- Run electrical to Form1 room
- Run electrical to kiln
- In
Per Scott, needs
- hole in outlet above projector
- inspect for exposed outlets
- install lights in hallway
- Considering
- 120v cables to quads in workshop
- 240v to front left corner of auto bay
- 240v to large air compressor
- 240v to welding table