Difference between revisions of "Improve Electrics"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
**** Run electrical to Form1 room | **** Run electrical to Form1 room | ||
**** Run electrical to kiln | **** Run electrical to kiln | ||
Per Scott, needs | Per Scott, " Pretty sure it's split phase 240. Pretty sure it just needs a 50A split phase outlet to run on 208V at a lower temperature/ramp." | ||
**** hole in outlet above projector | **** hole in outlet above projector | ||
**** inspect for exposed outlets | **** inspect for exposed outlets |
Revision as of 20:41, 15 September 2016
- Projects
- Electrical
Punch List
- In
- run code electrical to light in kitchen
- Run electrical to Form1 room
- Run electrical to kiln
- In
Per Scott, " Pretty sure it's split phase 240. Pretty sure it just needs a 50A split phase outlet to run on 208V at a lower temperature/ramp."
- hole in outlet above projector
- inspect for exposed outlets
- install lights in hallway
- Considering
- 120v cables to quads in workshop
- 240v to front left corner of auto bay
- 240v to large air compressor
- 240v to welding table