Line 13: | Line 13: | ||
**** install lights in hallway | **** install lights in hallway | ||
*** Considering | *** Considering | ||
**** run electrical to outlets on wall between work tables and admin closet | |||
**** Remove dropped quads from above work tables in front | |||
**** replace removed dropped quads above work tables with outlets at wall for each table | |||
**** 120v cables to quads in workshop | **** 120v cables to quads in workshop | ||
**** 240v to front left corner of auto bay | **** 240v to front left corner of auto bay | ||
**** 240v to large air compressor | **** 240v to large air compressor | ||
**** 240v to welding table | **** 240v to welding table |
Revision as of 21:04, 15 September 2016
- Projects
- Electrical
Punch List
- In
- run code electrical to light in kitchen
- Run electrical to Form1 room
- Run electrical to kiln
- In
Per Scott, " Pretty sure it's split phase 240. Pretty sure it just needs a 50A split phase outlet to run on 208V at a lower temperature/ramp."
- hole in outlet above projector
- inspect for exposed outlets
- install lights in hallway
- Considering
- run electrical to outlets on wall between work tables and admin closet
- Remove dropped quads from above work tables in front
- replace removed dropped quads above work tables with outlets at wall for each table
- 120v cables to quads in workshop
- 240v to front left corner of auto bay
- 240v to large air compressor
- 240v to welding table