Difference between revisions of "Improve Electrics"

From Freeside Atlanta
Jump to navigation Jump to search
Line 25: Line 25:
Greg Pica of Socket Doctors
Greg Pica of Socket Doctors


business card
[[Media:socket_doctor.jpg|business card]]

Revision as of 14:59, 19 September 2016

  • Projects
    • Electrical

Punch List

      • In
        • run code electrical to light in kitchen
        • Run electrical to Form1 room
        • Run electrical to kiln

Per Scott, " Pretty sure it's split phase 240. Pretty sure it just needs a 50A split phase outlet to run on 208V at a lower temperature/ramp."

        • hole in outlet above projector
        • inspect for exposed outlets
        • install lights in hallway
      • Considering
        • run electrical to outlets on wall between work tables and admin closet
        • Remove dropped quads from above work tables in front
        • replace removed dropped quads above work tables with outlets at wall for each table
        • 120v cables to quads in workshop
        • 240v to front left corner of auto bay
        • 240v to large air compressor
        • 240v to welding table

Electrician Contacted:

Greg Pica of Socket Doctors

business card