Punch List | |||
*** In | |||
**** run code electrical to light in kitchen | |||
**** Run electrical to Form1 room | |||
**** Run electrical to kiln | |||
Per Scott, " Pretty sure it's split phase 240. Pretty sure it just needs a 50A split phase outlet to run on 208V at a lower temperature/ramp." | |||
**** hole in outlet above projector | |||
**** inspect for exposed outlets | |||
**** install lights in hallway | |||
*** Considering | |||
**** run electrical to outlets on wall between work tables and admin closet | |||
**** Remove dropped quads from above work tables in front | |||
**** replace removed dropped quads above work tables with outlets at wall for each table | |||
**** 120v cables to quads in workshop | |||
**** 240v to front left corner of auto bay | |||
**** 240v to large air compressor | |||
**** 240v to welding table | |||
Electrician Contacted: | |||
Greg Pica of Socket Doctors | |||
[[ | [[Media:socket_doctor.jpg|business card]] |
Revision as of 14:59, 19 September 2016
- Projects
- Electrical
Punch List
- In
- run code electrical to light in kitchen
- Run electrical to Form1 room
- Run electrical to kiln
- In
Per Scott, " Pretty sure it's split phase 240. Pretty sure it just needs a 50A split phase outlet to run on 208V at a lower temperature/ramp."
- hole in outlet above projector
- inspect for exposed outlets
- install lights in hallway
- Considering
- run electrical to outlets on wall between work tables and admin closet
- Remove dropped quads from above work tables in front
- replace removed dropped quads above work tables with outlets at wall for each table
- 120v cables to quads in workshop
- 240v to front left corner of auto bay
- 240v to large air compressor
- 240v to welding table
Electrician Contacted:
Greg Pica of Socket Doctors