Improve Electrics

From Freeside Atlanta
Revision as of 14:56, 19 September 2016 by Jud (talk | contribs)
Jump to navigation Jump to search
  • Projects
    • Electrical

Punch List

      • In
        • run code electrical to light in kitchen
        • Run electrical to Form1 room
        • Run electrical to kiln

Per Scott, " Pretty sure it's split phase 240. Pretty sure it just needs a 50A split phase outlet to run on 208V at a lower temperature/ramp."

        • hole in outlet above projector
        • inspect for exposed outlets
        • install lights in hallway
      • Considering
        • run electrical to outlets on wall between work tables and admin closet
        • Remove dropped quads from above work tables in front
        • replace removed dropped quads above work tables with outlets at wall for each table
        • 120v cables to quads in workshop
        • 240v to front left corner of auto bay
        • 240v to large air compressor
        • 240v to welding table

Electrician Contacted:

Greg Pica of Socket Doctors

business card