Projects

  • Electrical
  • Next Step:
  • [ ] Clarify steps required to get a project approved for work by others.

As an example, what steps are required by Freeside in order to have work done that will make the kiln usable by members or guests?

Punch List

  • In
  • run code electrical to light in kitchen
  • Run electrical to Form1 room
  • Run electrical to kiln
  • Per Scott, " Pretty sure it's split phase 240. Pretty sure it just needs a 50A split phase outlet to run on 208V at a lower temperature/ramp."
  • hole in outlet above projector
  • inspect for exposed outlets
  • install lights in hallway
  • Considering
  • run electrical to outlets on wall between work tables and admin closet
  • Remove dropped quads from above work tables in front
  • replace removed dropped quads above work tables with outlets at wall for each table
  • 120v cables to quads in workshop
  • 240v to front left corner of auto bay
  • 240v to large air compressor
  • 240v to welding table
  • Electricians Contacted:
  • Greg Pica of Socket Doctors
  • No document (quote or estimate) received yet. (27 September)
  • Twon of AG Electrical LLC
  • Phone: +1-470-301-7696